Vegetation is found growing on the front portion of the Margao Municipal Council heritage building. Captured by : Santosh Mirajkar
MARGAO
The monsoons are set to finally retreat, but the plastic sheets placed on the windows of the Margao Municipal building to prevent water seepage bear testimony that all is not well with the 118-year-old heritage building. That’s not all. The building’s roof hosts plants and vegetation, indicating the state of utter neglect and delay in maintaining the heritage structure.
Margao Municipal engineers admit in private that the Municipal building is indeed in need of urgent attention.
“Water seepage was rampant inside the building during the last monsoon. The building walls had turned damp and soggy. A portion of the ceiling had crumbled down,” the officer said.
The officer pointed out that GSUDA has requested the deposit of funds to initiate the process, appoint a consultant to prepare the estimates before floating the tender.
“It is solely up to the Council how to arrange the substantial funds to execute the building renovation work,” he said.
Margao Municipal Chairperson Damu Shirodkar said he has obtained approval for the roof repair work since it may take time for the heritage building renovation plan to materialize.
“The building roof, on the western side, may give way in the coming monsoons if not repaired promptly. Since GSUDA has asked for funds to initiate the renovation work, we will have to decide how to proceed with the work,” Damu added.
