FRIDAY, 18 SEPTEMBER 2026

GIDC reforms aim for faster, fairer project clearances

Weekly open meetings, rule-based reviews, online tools introduced

PANAJI

To speed up industrial clearances and make the process more transparent, the Goa Industrial Development Corporation (Goa-IDC) has announced that its technical clearance meetings will now be held every week instead of every two weeks. The meetings will also be open to stakeholders, replacing the earlier closed-door format.

This change is part of the Online Building Plan Approval System (OBPAS), which the GIDC describes as a major step towards faster, fair, and predictable approvals.

“Before 2023, technical clearance meetings were held once a fortnight. Under the new system, they are now held weekly, helping us make quicker decisions. The process, which was earlier limited to closed-door discussions, is now open to clients, engineers, and architects,” said GIDC Managing Director Pravimal Abhishek.

He added that a rule-based agenda has replaced the earlier discretionary approach, ensuring consistency and fairness. “Every deferral or rejection now includes recorded reasons, improving accountability,” he said.

These changes, he noted, have already shown results, with technical clearances rising from 76 between August and December 2022 to 160 between January and June 2023.

At an advanced workshop on preparing plans in line with OBPAS, architects, engineers, and other experts were given live demonstrations and briefed on the reforms that make the system rule-based and transparent.

OBPAS also allows applicants to pre-check building drawings for free before submission, offers a paperless workflow, and enables real-time tracking of applications. Built on the DIGIT technology stack, the system ensures scalability, reliability, and data security.

Further improvements include a Pre-Scrutiny Tool for automatic validation of plans, Design Standard Checks to ensure compliance, and a One-Cycle Review System to reduce repetitive scrutiny and shorten approval timelines.

SHARE ON

Porvorim grinds to a halt as NH-66 trial closure sparks traffic mayhem

THE GOAN NETWORK
Published Oct 14, 2025, 12:33 AM IST
SHARE ON

      MAPUSAA two-hour trial run to test road closures on National Highway 66 for the ongoing elevated corridor project between Porvorim and Guirim turned into a traffic nightmare on Monday morning, leaving commuters stranded in long, unmoving queues for nearly three hours.The “trial closure,” undertaken to study traffic flow in case of a full shutdown of the stretch in the future, backfired as vehicles piled up at key junctions including Arradi“Socorro,…

READ MORE

Keep Reading — More from GOA NEWS

2 more related stories queued · tap to continue reading

Home HOME News GOA NEWS Global GLOBAL GOENKAR Search SEARCH