the goan I network
MARGAO
For long now, the Margao two-wheeler cum footbridge was deserted by pedestrians and motorists for fear of being the target of robbers and anti-socials.
The bridge stands illuminated now, keeping the anti-socials at bay at nights. Motorists and pedestrians, however, encounter another problem - the damaged surface which has virtually made the footbridge unmotorable.
Indeed, while the footbridge - linking Margao's congested station road to Rajendra Prasad stadium road, Calconda - has been lying in a dilapidated state over the last few months, but PWD officials, be it Executive engineer, Assistant engineer or Junior engineer, appears to be groping in the dark over the upkeep and maintenance of the structure.
Otherwise, consider this. Huge craters have surfaced over the footbridge, virtually rendering the bridge unmotorable towards the southern side. The entire structure built over the railway tracks has turned an eyesore. The railings a well as the concrete walls are craving for a coat of paint, but in vain. The wire mesh has almost given way, posing danger to the motorists and pedestrians using the bridge, especially during the night.
That neither PWD workers nor Margao Municipal employees sweep the footbridge at regular intervals is evident by the fact that waste has been lying accumulated on the approach roads to the bridge.
When The Goan had recently draw attention of the Margao MLA Digambar Kamat to state sorry state of affairs of the footbridge, the Margao MLA had shot back saying whether the upkeep and maintenance of the bridges and roads does not form part of the routine job of the PWD officials. "In the past, I had intervened and got the footbridge repaired. I think that repairs and upkeep of footbridges and roads forms part of the routine duties of the officials. They should do their work as part of their job," Kamat said.
Sources in the know said that the footbridge needs major repairs. "Let the PWD shut down the footbridge for some days, but they should carry out the repair work in a proper manner. I think the concrete surface needs to be re-laid to meet the requirements. Mere patch work will not suffice and serve the purpose," sources said.
As many as three two-wheeler cum footbridges were built by the Konkan Railway Corporation over the railway tracks for the Goa government over the last one decade. Says KRC DGM, Public Relations, Baban Ghatge: "The KRC has nothing to do with the upkeep and maintenance of the three footbridges. After construction, we have handed over the bridges to the PWD. It is their responsibility to look after the maintenance of the footbridges".
