THURSDAY, 17 SEPTEMBER 2026

Planned power shutdowns!

In a front-page advertisement, the Chief ElectricalEngineer announced a planned shutdown of only EHV lines/sub-stations on 11/4with the entire South Goa going without power from 7 am to 2 pm.  He further states that other plannedshutdowns of 11/33 KV will be taken up later ‘as scheduled’!

We are 2 months from the monsoons and surely all thesubstations could have planned the maintenance on the same day! The governmentalready informed the public that this year the summer would be hotter thanbefore. The public are indeed dispensable even in the eyes of the bureaucrats!

The vaccination drive is being held on all days includingSundays: hopefully all such centres have adequate power backup for therefrigerated storage of the vaccines and fans for the people. Otherwise, wewill see the public removing their masks because of the heat.

SHARE ON

Post vaccination deaths a cause for concern

ELVIDIO MIRANDA, via email
Published Apr 6, 2021, 11:33 PM IST
SHARE ON

Though by and large the advent of vaccination has brought about relief from corona virus, it is still disturbing that in the UK, of the over 18 million so far vaccinated with the AstraZeneca shot, 30 patients have developed blood clot of which 7 deaths have resulted. In Germany too, of the over 2.7 million jabs of the same vaccine that has been administered, 31 cases of blood clotting have resulted in 9 fatalities. Though these figures seem small, still they are…

READ MORE
Home HOME News GOA NEWS Global GLOBAL GOENKAR Search SEARCH