A harvester harvesting paddy at the Tolleaband water body, Benaulim. (right) The Benaulim farmers who have registered a moderate paddy yield this season Captured by : Santosh Mirajkar
MARGAO
Benaulim farmers have done it again despite the government bulldozing with the western bypass project through the Tolleaband water body.
For the third consecutive year, the farmers have harvested a moderate amount of paddy from the agricultural fields spread across the Tolleaband water body. A huge embankment wall might have divided the Tolleaband water body into two to make way for the western bypass. The man-made divide, however, has failed to deter the farmers, who with their grit and determination have continued to cultivate the fields of their ancestors year after year.
A visit to the Tolleaband water body showed a mechanical harvester harvesting the paddy from the lake, bringing smiles on the faces of the farmers. Farmer Raymond Costa said the farmers have harvested a moderate yield this season. “We have no complaints to make. We have harvested moderate paddy. This is the fruit of our hard work and labour”, he said.
He added: “Farmers cultivating the fields at Tolleaband have now switched over to mechanised farming. Fr George Quadros have lent his support to the farmers by providing mechanical transplanters for transplanting of paddy. For harvesting, we have procured harvestor from Moreno Rebello. We are happy with the paddy yield”.
An elderly farmer John Barretto said these very fields were being cultivated by their ancestors and the present generation have maintained the rich tradition. “Farmers encounter so many problems relating to paddy cultivation. But, farmers from Tolleaband have faced and overcome so many obstacles along the journey, including the western bypass that was built through the water body despite repeated pleas by the farmers to build the same on stilts”.
While the Benaulim farmers have registered a moderate paddy yield, and will return back to the fields post-monsoons, citizens keep their fingers crossed over what lies in store for the low lying areas of Khareband-Benaulim in the coming monsoons. For, there are no measures implemented on the ground to mitigate floods in the flood plains of the river Sal.
In fact, recommendations made by Central government expert R K Pandey for a comprehensive drainage plan at the Khareband-Benaulim stretch have remained on paper till date. Neither the additional culverts recommended by Pandey are in place, nor is the river Sal de-silted/dredged for smooth flow of the rain water during monsons.
