SUNDAY, 6 SEPTEMBER 2026

Complete work around Chandor flyover bridge

Thanks to the BJP government who has done a good job along with Railway authorities to complete the work and open the road flyover bridge to public at Chandor.  The inauguration of the flyover bridge is done and opened for the traffic but some work is pending as the safety barrier and the walls on both the side of the bridge are not painted yet which is putting the lives of the innocent public at risk. There are electricity poles on the bridge but not on the both sides of the Chandor and Curtorim roads which is dangerous for night time traffic.  The road is in a bad condition and needs urgent hot mix  for a smooth ride. The road from Curtorim-Davorlim side is in a bad condition and the side lines on the bridge should be maintained well ahead of rainy season. Request our State government,  PWD Minister and Electricity minister to immediately look into this matter and solve these issues.   Hope the government will take up the hot mix road job and painting of the roads and safety barrier at the earliest.


SHARE ON

Accidents waiting to happen on Benaulim-Varca road

VINAY DWIVEDI, Benaulim
Published Apr 13, 2023, 7:19 PM IST
SHARE ON

I have observed this hazardous condition of the road at several places on the Benaulim-Varca road, uncovered concrete rainwater drains which have electricity cables crossing through it and damaged tar of the road edge. This poses a great danger to vehicles, especially two wheelers. I have seen people meet with bad accidents in this stretch at night, with no pavements along village roads this civic neglect also poses a grave danger to pedestrians. Will the panchayat /…

READ MORE
Home HOME News GOA NEWS Global GLOBAL GOENKAR Search SEARCH