FRIDAY, 4 SEPTEMBER 2026
Ticker

Diversion till completion of third bridge: DySP Traffic

In an attempt to lay to rest the anxiety over the diversion of heavy vehicles on the two existing Mandovi Bridges and closure of the old Mandovi Bridge, Deputy Superintendent of Police (Traffic) Dharmesh Angle declared that while the diversion of heavy vehicles will continue till completion of the new bridge, both bridges will never be closed down at once.


PANAJI   

With the sole aim of preventing​ bottlenecks and to ensure smooth flow of traffic, heavy vehicles will be diverted via Karaswada and Banastarim along Amona, it was informed.   
Speaking at Traffic Police headquarters at Altinho in Panaji, DySP Angle stated, “Based on past incidents, we have decided to equip ourselves with these magisterial orders to meet situations in the future. These orders will be executed on need-basis. We have already diverted heavy vehicles over the last 20 days in a successful and smooth manner. Heavy vehicles can ply on the bridges after the new bridge is inaugurated.”   
He informed that if need arises to temporarily close down the old Mandovi bridge, it will preferably be done at night.   
While speaking about the restriction on heavy vehicles over the bridges, DySP Angle reiterated that this will be done only during the peak traffic hours from 8 am to 10 pm. 
He also stated that as of now, the interstate buses will be allowed to ply on the bridges and added, “Interstate bus corporations and stakeholders will be taken into confidence before we ever make the decision to divert these buses as there is no specific route given to these buses. Local route buses will continue to operate.”   
Traffic police department further explained that tankers, which require refueling in Porvorim area or carry petroleum products to the petrol stations lined up along the area, will be issued passes to approach the spots at convenient times. “This is an essential commodity and hence has been exempted,” DySP Angle stated.   
It was informed that the two orders were passed by the collector on the basis​ of several instances of trailers employed for bridge construction work breaking down on the narrow road carpet around 
Porvorim. In one specific instance a concrete 
laying machinery broke down during piling work on the main bridge structure work causing several hours of anxiety to the 
contractor Larsen and 
Toubro.  
SHARE ON

Bridge closure effect: trucks parked at Pernem inconvenience motorists

With the government banning all trucks from plying on the Mandovi bridge from 8 am to 10 pm, trucks proceeding from Maharashtra have been parked on both sides of NH17 in Pernem taluka, causing inconvenience to motorists.

the goan I network
Published Apr 12, 2017, 4:04 AM IST
SHARE ON

PERNEM   According to locals, trucks proceeding from Maharashtra via Patradevi in the evening have been parked on both sides of the NH17 blocking the roadside kiosks. The restriction for entry ends at 10 pm.   “Some trucks reach after 8 am and wait till 10 pm due to which there is lot of traffic congestion,” complained a local. “The government should arrive at a solution or should find a suitable parking place for these trucks,” demanded…

READ MORE

Keep Reading — More from GOA NEWS

2 more related stories queued · tap to continue reading

Home HOME News GOA NEWS Global GLOBAL GOENKAR Search SEARCH