SUNDAY, 13 SEPTEMBER 2026

Pending roadwork finally begins in Bhironda

Pending roadwork finally begins in Bhironda
Poriem MLA Deviya Rane inaugurates the hotmixing work at Ansole-Bhironda in the presence of Bhironda Sarpanch Tereza Andrade and others. Captured by : Uday Sawant

VALPOI

The long-pending roadwork along a 2-km stretch of the road finally began at Ansole in Bhironda-Sattari.
Poriem MLA Deviya Rane inaugurated the Rs 90 lakh roadwork in the presence of Nagargaon ZP Member Rajeshri Kale, Bhironda Sarpanch Tereza Andrade, panchas and PWD officers.
Speaking on the occasion, Rane said the much-awaited roadwork has been started with the help of Health Minister Vishwajit Rane and PWD Minister Nilesh Cabral. She assured that pending roadworks in other panchayat areas would also be completed soon.
The roadwork had been pending for many years and aggrieved locals had complained that the bad road had caused hardships to residents, office-goers and students, while emergency services like 108 ambulances were reluctant to travel on the bad road.
They had protested in this connection and had even threatened to boycott the elections in 2017. Health Minister Vishwajeet Rane later intervened and got the roads repaired to some extent.
The issue resurfaced during the recent assembly elections when residents raised the matter during the campaign meeting of Deviya Rane and she had promised to launch the roadwork as soon as she was elected.

SHARE ON

Tawadkar relaunches Rs 4.10 cr roadworks in Loliem-Polem

Works involve repairs, tarring and laying of hotmix on different roads

THE GOAN NETWORK
Published Apr 23, 2022, 11:39 PM IST
SHARE ON
Tawadkar relaunches Rs 4.10 cr roadworks in Loliem-Polem

CANACONAA little over three months after the launch of roadworks at Loliem-Polem, Speaker and Canacona MLA Ramesh Tawadkar relaunched the Rs 4.10 crore roadworks on Thursday.The roadworks involve repairs, tarring and laying of hotmix on different roads (Maxem to Agas, Loliem Church to Pedem, Dapot to Kajelkar, Dhaptamoll, Polem via Gali, Dhulgal to Shelim) a total length of 16 kms in Loliem-Polem.Tawadkar relaunched the roadworks in the presence of Loliem-Polem Sarpanch…

READ MORE

Keep Reading — More from GOA NEWS

2 more related stories queued · tap to continue reading

Home HOME News GOA NEWS Global GLOBAL GOENKAR Search SEARCH